top of page
IMG_2746.jpg

System 28 Wrap

This solution provides the retailer with a fresh new island look and combines mounting stainless steel bands to existing islands and applying our formulated non slip concrete grey top coat that provides durability, texturized for non slip, easy to maintain and keep clean to complete your fuel station islands. This solution requires ZERO hot work on site. The System 28 is much more cost effective when compared to a full tear out of existing fuel islands. The System 28 reduces downtime at fuel pumps “to hours NOT days!”. Requires no removal of fuel pumps or equipment and will not disrupt customer convenience and sales.

How it works: Watch the System 28 Install Video

304 Stainless Steel Concrete anchors

Our Patented 304 Stainless Steel "System 28" bands with a bullnose profiling

Our formulated non slip concrete grey top coat

Sealing the bottom of the stainless steel bands with Polyurethane 

Shell Canada Before and After the System 28 Wrap 

IMG_2769 2.JPG
IMG_2766.JPG

 Shell Canada Before and After

IMG_5500.jpg

Co-Op Before and After

7- Eleven Before and After

IMG_5369.jpeg

Our Safety

  • All Team members are POST certified

  • Hardhat

  • Safety boots

  • High VIS vest

  • Ear plugs

  • Safety glasses

  • Gloves

  • Fire extinguisher

  • MSDS on all products

  • Safety cones and caution tape

  • Welders safety tarp

IMG_2779.JPG

©2022 by Countryside Concrete Services

bottom of page